ExxonMobil Corp. shut a gasoline-producing fluidic catalytic cracker on Friday for planned work at its 502,500-barrel-per-day Baton Rouge refinery, Reuters reports.
The firm also plans to shut in a 45,000-bpd diesel hydrotreater in April for planned work.
The 110,000-bpd PCLA 3 FCC is scheduled to remain shut for a planned overhaul through April 15, and the diesel hydrotreater will be shut from April to mid-June for an overhaul. Read the full story.